Case studyCare provider with staff and volunteers

AI-Assisted Shift Scheduling and Funding Exports for a Japanese Care Provider

Shifts had to balance staff, volunteers, qualifications and patient need, which is too complex for a spreadsheet. We built AI-proposed scheduling with a human always deciding, and generated government funding exports from the same record.

Industry
Healthcare & Social Care
Region
Japan
Engagement
Lab-type ODC (dedicated team)

Outcomes

  • AI-proposed, human-approved rosters
  • Planned vs actual in one record
  • Funding claims generated automatically

Stack

Python · Scheduling optimisation · Web app · PostgreSQL · Cloud

Written byOriental Nippon Team

A Japanese care provider delivers care both on its own premises and in the community. Its workforce mixes employed support staff and volunteers, each with different availability, qualifications and limits. Its funding comes through a government scheme that wants activity reported in a specific format.

All of that was coordinated by hand, and then translated by hand into the funding claim.

The problem

  • Too many constraints for a spreadsheet. Staff, volunteers, qualifications and patient needs all had to line up.
  • Two kinds of care, one picture. On-site and off-site visits were scheduled differently but had to be seen together.
  • Plan and reality disagreed. Activity was recorded separately from the schedule.
  • Claims rebuilt from scratch. The funding submission was assembled from several sources.
  • High stakes. A scheduling mistake could mean a care visit not happening.
BeforeAfter
SchedulingManual coordinationAI-suggested, human-approved
Planned vs actualTwo separate recordsOne record
Funding exportRebuilt by handGenerated in the scheme's format
ValidationAfter submissionTested against real submissions before go-live

What we built

  • AI-supported scheduling

    Proposes shift assignments against availability, qualifications and location. A person always makes the final call.

  • Activity tracking tied to the schedule

    Completing a visit updates the schedule itself, so planned and actual are one record.

  • Compliant funding exports

    Generated from the activity record in the format the national funding system expects.

Each shift moves from suggestion to funding claim on one record:

Technology and the role it played

TechnologyRole in this project
PythonScheduling logic and constraint handling
Scheduling optimisationProposes assignments against availability, qualifications and location
Web applicationCoordinator view for review and approval
PostgreSQLStaff, volunteers, patients, sites and activities
Cloud hostingAccess from on-site and community care

How we delivered it

Our ODC team mapped the full constraint set first: who can do what, where, when, and under which rules. Scheduling suggestions only came after that model existed.

  1. Map the constraints. People, qualifications, sites and funding rules.
  2. Foundation. Data model for staff, volunteers, patients, sites and activities.
  3. Scheduling, then the assistant. Suggestions always reviewable before they take effect.
  4. Activity tracking. Completion updates the schedule, not a parallel log.
  5. Funding export. Validated against real past submissions.
  6. Pilot. One team through a full funding period.
Delivery timelineIndicative total: 16–23 weeks
  1. 01Discovery

    2–3 wks

    Constraint set, funding requirements, care patterns

  2. 02Foundation

    2–3 wks

    Data model, environments, access control

  3. 03Scheduling and assignment

    4–6 wks

    Rosters, constraints, assistive suggestions

  4. 04Activity tracking

    3–4 wks

    On-site and off-site capture tied to the schedule

  5. 05Billing export

    2–3 wks

    Format compliance, validation against real submissions

  6. 06Pilot period

    3–4 wks

    One team through a full funding cycle

Risks and how we handled them

RiskHow we handled it
A missed care visitEvery suggestion is reviewed by a coordinator before it takes effect
Funding claims rejectedExports validated against real past submissions
Plan and reality disagreeingActivity recorded against the schedule itself

Outcome

Shift management became one activity instead of a coordination problem solved by hand every week. The funding submission now comes from the same record that runs the care.

Connecting to the national funding scheme became straightforward and cheap. That was the outcome the client cared about most, and the one we tested most carefully before go-live.

What the client keeps

  • The production system and its source, in their own repository
  • The constraint and qualification model
  • The export specification and its validation cases
  • Operational runbooks

Sources and further reading

  1. People + AI Guidebook, Google PAIR
  2. Guidelines for human-AI interaction, Microsoft HAX Toolkit

Facing something similar? This is the kind of work our AI, Data Science & Automation team delivers every day. Talk to us about your stack.